DOE-ACCREDITED SOLAR EPC · SERVING PASIG CITY, METRO MANILA

Solar Panel Installation in Pasig City Metro Manila

Hybrid and grid-tied solar for Pasig homes, offices and businesses, from Kapitolyo and Ugong to Rosario and Santolan, with full Meralco net metering support.

Ecoplus Solar Inc. designs, supplies and installs complete solar power systems for homes, townhouses, offices, shops, warehouses and commercial buildings in Pasig City, Metro Manila. As a DOE-accredited solar EPC (Engineering, Procurement and Construction) contractor, we serve all 30 barangays of Pasig, from Kapitolyo, Ugong, San Antonio and Oranbo to Rosario, Santolan, Manggahan, Maybunga and Pinagbuhatan. We handle the whole job for you: the free ocular inspection, system design, permits, installation, and Meralco net metering registration.

Ecoplus Solar in Pasig City, Metro Manila

Founded in 1573 and named after the river that runs through it, Pasig is one of Metro Manila’s oldest and fastest-growing cities, home to about 853,000 residents across 30 barangays. Once the capital of Rizal province, it became a highly urbanized city in 1995 and today shares the Ortigas Center business district with Mandaluyong and Quezon City. Its western side hosts offices, condominiums, malls and developments such as Capitol Commons, Arcovia, Bridgetowne and the Kapitolyo food district, while the eastern barangays along the Marikina River and Manggahan Floodway are largely residential. Pasig is bordered by Quezon City, Mandaluyong, Marikina, Pateros, Taguig, Cainta and Taytay, and is served by C-5 and Ortigas Avenue. Electricity is supplied by Meralco, so Pasig homeowners and businesses pay Meralco rates and qualify for net metering under the Renewable Energy Act of 2008 (RA 9513) and the ERC Net Metering Rules.

Our work in Pasig includes a 16 kW commercial hybrid solar system with battery backup.

Our solar project in Pasig City, Metro Manila

You can also browse our wider solar panel installation work across Metro Manila.

Why Solar Makes Sense in Pasig

  • Strong sun in the costliest months. Daytime highs in Pasig reach about 33 to 34°C in April and May. Those hot months push aircon use and Meralco bills up, and they are also when your panels generate the most power.
  • Lower costs for businesses. Offices, shops, restaurants, clinics, schools and warehouses use most of their power during the day, making them ideal for rooftop solar. Our 16 kW commercial hybrid system in Pasig shows what is possible.
  • Protection from power interruptions. A hybrid system with batteries keeps your refrigerator, lights, Wi-Fi, work setup and critical business equipment running when the grid goes down, especially during typhoon season.
  • Net metering suits working households. Many Pasig residents work in Ortigas Center and nearby business districts. With net metering, the energy your panels produce while you are at work is credited to your Meralco bill.
  • Long-term value. A properly installed system lasts 25 years or more and adds value to homes and properties in one of Metro Manila’s most dynamic cities.

Solar Systems We Install in Pasig

  • Hybrid solar with battery backup: solar savings plus brownout protection, and still eligible for net metering.
  • Grid-tied (on-grid) solar: the fastest payback and lowest upfront cost for homes and businesses with high daytime use. See Ecoplus Home.
  • Commercial solar: rooftop systems for offices, shops, restaurants, schools and warehouses. See Ecoplus Biz.
  • Solar for townhouses and compact roofs: high-efficiency panels and careful layout to get the most out of limited roof space.

Advantages of Working with Ecoplus Solar

  1. DOE-accredited solar EPC. Our in-house engineers design every system to Department of Energy, ERC and Philippine Electrical Code standards, with electrical plans signed by a licensed Professional Electrical Engineer (PEE).
  2. Commercial hybrid experience in Pasig. We size batteries around the loads that matter most to your home or business.
  3. Designed for low-lying areas. For properties near the Pasig and Marikina Rivers and the Manggahan Floodway, we check local flood levels and mount inverters, batteries and electrical equipment above them.
  4. Subdivision and building coordination. Many Pasig villages and commercial buildings require approval before roof work. We help you prepare the plans and documents your HOA or building administration asks for and coordinate our crew’s access.
  5. Permits and net metering handled for you. We prepare and process the building and electrical permits, the Certificate of Final Electrical Inspection (CFEI), and your complete Meralco net metering application.
  6. Tier-1 equipment. We install high-efficiency Tier-1 solar panels and proven inverters and batteries, including Huawei Solar, backed by manufacturer warranties.
  7. Honest sizing and transparent quotes. We size your system from your actual Meralco bills and load profile, not from a sales target, and give you a clear, itemized quotation. Try our Savings Calculator for a quick estimate.
  8. After-sales support and free ocular inspection. Performance monitoring, preventive maintenance, panel cleaning and warranty claims are part of our long-term commitment, and the first site visit is free with no obligation.

How Our Solar Installation Process Works

  1. Book a free ocular inspection using the form on this page.
  2. Site assessment and bill analysis: roof orientation, shading, structure, flood exposure, and your recent Meralco bills.
  3. System design and quotation: system size, equipment, projected savings and payback period.
  4. Permits, HOA clearance and documentation: city permits, PEE-signed plans and subdivision or building requirements.
  5. Installation and testing: carried out by our own trained installers; most residential systems are completed in a few days.
  6. CFEI, net metering and turnover: we file with Meralco, set up your monitoring app, and walk you through your system.

Areas We Serve in Pasig City, Metro Manila

We install solar panels in all 30 barangays of Pasig: Bagong Ilog, Bagong Katipunan, Bambang, Buting, Caniogan, Dela Paz, Kalawaan, Kapasigan, Kapitolyo, Malinao, Manggahan, Maybunga, Oranbo, Palatiw, Pinagbuhatan, Pineda, Rosario, Sagad, San Antonio, San Joaquin, San Jose, San Miguel, San Nicolas, Santa Cruz, Santa Lucia, Santa Rosa, Santo Tomas, Santolan, Sumilang and Ugong. We also serve neighboring Pateros, Taguig, Marikina, Mandaluyong, Cainta and Taytay.

Frequently Asked Questions about Solar in Pasig City

How much does solar panel installation cost in Pasig City?

Cost depends on system size, type and roof. As an indicative 2026 range, a 3 kWp grid-tied residential system typically starts around ₱150,000 to ₱220,000, while hybrid systems with batteries and commercial systems cost more. You will get an exact, itemized quote after your free ocular inspection.

Is net metering available in Pasig?

Yes. Pasig is within Meralco’s franchise area, so grid-tied and hybrid systems can be registered under the ERC net metering program. Ecoplus Solar prepares and files the full application for you.

My home is in a flood-prone area of Pasig. Can I still go solar?

Yes. The panels sit on your roof, well above flood levels. For homes near the Pasig and Marikina Rivers and the Manggahan Floodway, we mount the inverter, batteries and electrical equipment above local flood levels to keep them safe.

Ecoplus is based in Cavite. Do you serve Pasig?

Yes. Our teams regularly install across Metro Manila, and we have completed a commercial hybrid installation in Pasig. We handle the permits and Meralco application just as we do in Cavite.

Will my solar system work during a brownout?

A grid-tied system shuts down automatically during an outage for safety. If you want power during brownouts, choose a hybrid system with battery backup.

How long does installation take?

Most residential installations in Pasig are completed within a few days once permits and HOA clearance are in place. Commercial projects follow a schedule agreed during design.

Hero photo: Pasig and the Ortigas Center skyline (aerial) by Patrick Roque, Wikimedia Commons (CC BY-SA 4.0).

Request a Free Ocular Inspection in Pasig City Today!

Ready to cut your Meralco bill? Fill out the form and our team will contact you to schedule a free, no-obligation ocular inspection of your Pasig home or business.

Please enable JavaScript in your browser to complete this form.
Name
Address
Date / Time

Ecoplus Solar Inc.
Mobile: 0976 223 4048
Email: ask@ecoplus.ph
Mon–Fri 7AM–7PM, weekends 10AM–5PM