Address
Purok 6, Tanza – Trece Road, Barangay De Ocampo, Trece Martires, Cavite, Philippines
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
Purok 6, Tanza – Trece Road, Barangay De Ocampo, Trece Martires, Cavite, Philippines
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Copyright 2015-2024. ECOPLUS. All rights reserved
Solar Energy Projects by Ecoplus Solar Inc.
Ecoplus Solar Inc. has designed and installed grid-tied and hybrid solar systems for homes, businesses and industrial facilities across the Philippines. The systems range from 3 kW rooftop setups for families to a 638 kW plant for a manufacturing site. Most of our installations are in Cavite, and we have also completed projects in Metro Manila, Laguna, Batangas, Rizal, Quezon, Bulacan and as far as Tacloban City in Leyte.
Every project below was handled by Ecoplus from start to finish: the site survey, system design, permits, installation, net metering coordination and after-sales support. Use the filters to browse by project type, region or location.
Homes make up most of our project list. Philippine households want lower monthly electric bills and dependable power during brownouts, and we size each system to how the family actually uses electricity.
Our residential installations range from 3 kW starter systems in Dasmariñas and Tanza to 20 kW hybrid systems for larger homes in Pateros. Some of the homes we have powered:
Grid-tied or hybrid: which is right for your home? A grid-tied system is the most affordable way to cut your bill. Under net metering, it can also earn credits for the extra power you export to the grid. A hybrid system adds battery storage, so your lights, refrigerator and Wi-Fi keep running during outages. This matters a lot in areas with frequent interruptions or in upland towns like Silang, Alfonso and Tagaytay. We have installed both types, and our engineers recommend one based on your consumption, roof space and budget.
For shops, offices, clinics, restaurants and small businesses, electricity is one of the largest operating costs. Most commercial energy use happens during the day, when solar panels produce the most power. That makes businesses one of the best fits for solar in the Philippines.
Our commercial projects range from 10 kW to 60 kW:
Commercial clients get load analysis, structural assessment of the roof, and a system designed to offset their daytime demand. We also handle LGU permits and net metering documents, so owners can stay focused on running the business.
Our largest installations are for industrial facilities. Factories, warehouses and processing plants run heavy equipment for long hours, and solar can bring down their power costs significantly.
Our industrial portfolio includes:
Industrial projects need more detailed engineering: structural load studies for large roofs, protection coordination, and close work with the distribution utility on interconnection. Our team has delivered systems of several hundred kilowatts within Cavite’s industrial corridor and in provinces outside Luzon’s main growth areas. The Tacloban project shows we can mobilize to the Visayas.
Do you want to cut your household bill, protect your business from brownouts, or lower your factory’s energy costs? Ecoplus Solar Inc. has done it for clients like you. Book a free site survey and our engineers will recommend the right system size, type and expected savings for your property.
